26/08/13


DSS Audio were delighted to be asked back to run A stage at the popular somerset festival held in between Frome and Shepton Mallet.

This year we found ourselves running the second live stage. A huge variety of musicians and DJ's played through our Turbosound Floodlight system over the weekend.


Front of house was taken care of by Paul Mullens with a Midas Verona and outboard of various types.


The main system was a Turbosound Floodlight system with FlashLight 21" Subs underneath. The Amplifier rack was Powersoft driving the 21's and Lab Gruppen Driving the Floodlight.


Stage Monitors were 8 x Audio Analyst AA12FR's Driven by Crown Amplifiers.


Lighting was 4 x High End System's StudioSpot Moving heads with 12 x Par 64 cans over 12 channels of dimming. All controlled by an Avolites Pearl.


19/08/13

Thursday - (Morning) Wedding Lighting set up  (Afternoon) Wedding sound in Somerset.


Friday - (Morning) Festival set up ready for Saturday and  Sunday. 

(Afternoon) Wedding Sound system set up in Trowbridge.


Saturday - Festival operate.


Sunday  - (Morning) Collect all the wedding jobs (Afternoon) Operate Festival